Direct-to-chip deployment
CDU integration, secondary loop distribution, flushing and commissioning under load.
SCOPE / 01Liquid cooling · AI data centers
Liquid cooling engineering, integration and commissioning for AI data centers in Mexico and the Americas.
The problem
or more per rack on current platforms
liquid coverage required by the next generation
of operators have deployed liquid cooling
are considering it but have not deployed
The gap between those last two numbers is not about budget or hardware availability. It is about who can actually build and certify the loop.
What we do
Loop design, CDU sizing, redundancy architecture (N+1 / N+N), fluid specification.
Multi-vendor CDUs, manifolds, quick-disconnects, filtration and stainless / polymer distribution.
Primary loop, secondary distribution, rack manifolds and shop-fabricated, factory-tested assemblies.
Documented cleanliness protocol, filtration, PG25 compatibility verification, chemistry sign-off.
Pressure and leak testing, performance validation under load, signed commissioning report.
Chemistry monitoring, preventive maintenance, leak response, telemetry, operator training.
The system we deliver
Select any block to see the technical specification.
Why Nexterm
Delivered liquid cooling projects when almost no one in the region had signed one. Over 30 years of HVAC, thermal engineering and commissioning experience stand behind the signature.
Fluent across every major CDU platform. We specify what the project needs, not what we are contracted to sell.
Microchannel fouling, fluid incompatibility, cleanliness. We know where loops fail because we have prevented it.
You receive a commissioning report with our name on it, not a delivery note.
Power-constrained capacity
In a power-constrained market, liquid cooling is not an upgrade. It is a capacity strategy.
When the electricity network cannot deliver another 10 MW and interconnection permits run six months to over a year, the only remaining path to more compute is reducing the cooling overhead on the megawatts you already hold.
Cooling overhead: +0.54 MW
Cooling overhead: +0.09 MW
Same 1 MW IT load in both cases.
Reference projects

CDU integration, secondary loop distribution, flushing and commissioning under load.
SCOPE / 01
Cooling integration for a pre-assembled facility, mechanical coordination and thermal validation.
SCOPE / 02
Conversion of existing capacity to a hybrid air-liquid architecture with qualified rack manifolds.